Fixing a level access wetroom onto a traditionally constructed board and joist floor is straight forward but it’s recommended the work is carried out by a qualified professional. A feasibility site survey should also be carried out in advance to ascertain the length, direction of the waste and joists etc.

 

Wood Floors

 

 

Concrete Floor - Level Access

 

 

© Crosswater Limited 2015.      SITE MAPS      Terms and Conditions      Privacy Policy